Thursday, January 18, 2018

Launching On 18.01.2018.

Finally ready to be launched and all the outside work are (nearly) completed, so the rest (a lot) of the preparation work will be done in the water.









Saturday, January 13, 2018

2018: Pangkor Marina.

Was back in Pangkor Marina on 5 January 2018 and the preparation work started. The AF has been done with a heavy sanding, before two layers of primer and three layers of AF.

 My new fluorescent hand drill, installing the bow propellers and the protection guards. 
 All the blue lines and the lower two white water lines have been painted by Jimmy and the result is good. Now I hope he will polish everything before I will be launched on Thursday 18 January.





Before.
 The water damage seems to have shrunk the rubber for the carpets and they appear humid. It has been impossible to find a suitable rubber here in town, so the old ones will have to do and I can have a look in Phuket. But they don't look healthy.



After Carpets are placed. Not really clean, nor completely spotless and they seems to have changed  size.