Work In Progress And People Running Everywhere........

Today I had my Chief Engineer (yours truly) checking the Volvo Engine, the Westerbeke Generator and the Gori Propeller, as well as starting it all. So far it all works well. Ran each for about 45 minutes and all indicators were positive.

Then I had the Carpenter (yours truly) in to install the side boards and it all starts to look good again. The cleaner (well you guessed it) came backs to finalize cleaning the cockpit. After that my chief electronic engineer (yes, yes....) installed some of the instruments like the AIS, main Simrad Plotter CA42 and Standard Horizon plotter. All worked as they should, but the new Simrad CA42 refuse to lid up even though he found that it gets 24 V power, so he is now at a loss on how to get this sorted out, as well as the second radar "Si-Tex" to work. 